Asante Gold Corp. said recently that it has secured a Temporary Mining Exploration Operating Permit for its Kubi Gold project in Ghana.
With the permit, construction of the mine's portal and exploration decline can begin. The Kubi Main Deposit will be a 4-meter-by-4.5-meter exploration decline at a -15 percent grade. Exploration will take place on three levels of the mine: at 60 meters, 120 meters and 180 meters. From these levels, bulk samples will be extracted for test milling.
Preliminary design at the mine has been conducted by Mining and Building Contractors Limited in Obuasi; company representatives will now move on to mining and surface-infrastructure activities.
The total development depth of the mine will be about 2,100 meters and will include mucking bays, safety bays, parking bays, electrical cubbies and drill stations.
Infrastructure projects and improvements at the mine site will include upgrades to the access road, fencing around the perimeter, diesel-generated power, offices and a change house with a lamp room, water and waste management.
To view a 3D plan of the mine, visit www.asantegold.com/assets/img/KubiGoldProposedDecline.pdf.
More information about the project is available online at www.asantegold.com.
More Stories
- Minister Martin Henry to leave St. Helena during recess
- Royal Saint Helena Police announce changes to vetting certificate processing schedule
- ECOWAS calls for cooperation to tackle West African security challenges
- Ambassadors present credentials to President Bio at State House
- President Bio highlights role of media at annual cocktail event
- President Bio meets new bike riders' union executive to discuss transport improvements
- Sierra Leone president thanks EU for supporting national peace dialogue
- West African Power Pool appoints Abdoulaye DIA as new secretary general
- German president visits ECOWAS to strengthen bilateral cooperation
- President Bio urges youth involvement at Salone Civic Festival